TCC Bridge
ENGINEER
TGA Engineers
LOCATION
Brynwood Av, Drouin
COMPLETION
2014
PHOTOGRAPHER
N/A
CLIENT
Hacer Group
SECTOR
Residential
ARCHITECT
BUILDER
ENGINEER
TGA Engineers
LOCATION
Reeves St, Carlton
COMPLETION
2014
PHOTOGRAPHER
N/A
The adoption of Timber Concrete Composite (TCC) for external applications, such as this pedestrian bridge in the shire of Baw Baw, allowed for a very durable deck with the use of timber primary beams. Composite action using shear studs permitted the use of shallow girders that would otherwise be engineered.
The prefabricated bridge was transported as a complete unit and installed on the footing within 1 hour of arriving to site, reducing labour costs for the project and minimising disruption to the local environment.