DEPI Office Redvelopment
CLIENT
Department of Environment and Primary Industries
​
SECTOR
Institutional ​
​
ARCHITECT
​
BUILDER
ENGINEER
TGA Engineers
LOCATION
Mickleham Road, Attwood
​
COMPLETION
2013
​
PHOTOGRAPHER
N/A
CLIENT
Department of Environment and Primary Industries
SECTOR
Institutional
​
ARCHITECT
BUILDER
​
ENGINEER
TGA Engineers
LOCATION
Mickleham Road, Attwood
​
COMPLETION
2013
​
PHOTOGRAPHER
N/A
This project involved the design, fabrication, and delivery of 21 meter span HySpan LVL portal frames at 6 meter bay spacing. The timber components were prefinished in the workshop and delivered to site. The tapered column and rafter sections allowed for an efficient yet graceful design.
​
TGA Engineer's structural team designed and detailed the CNC-cut LVL portal sections to create an efficient, yet graceful structure. The connections and fasteners were designed to maximize structural performance and ensure constructability in both the shop and site.
​
Our streamlined design-build system allowed for the Stage One portal frames to be erected in liaison with the builder in a single day. As a result of the Stage One’s success and the client’s satisfaction we were awarded the second stage of the project, which was completed in 2013.