top of page
SJPS-22.jpg

St Joseph's Primary School

St Joseph's Primary School

SJPS-7.jpg
SJPS-8.jpg

St Joseph's Primary School

SJPS-5.jpg

The unique project our company undertook for St Joseph’s Primary School in Hawthorn was the first of its kind for Australia, as we fabricated and installed a large-span structural timber floor system stretching 17 metres across. The first floor design was built using 1m deep radiata pine LVL for the primary and secondary beams, with 25mm plywood covering the entire structure before concrete was poured on-site. 

​

The project took advantage of timber concrete composite as a substantially more lightweight and economical alternative to a solid concrete floor, and the use of timber also allowed for effortless coordination with the surrounding steel framework. Furthermore, we were able to leave large parts of the floor’s underside exposed, giving the multi-purpose room below warmth and raw, organic textures; utilising the aesthetic appeal timber has to offer. 

CLIENT

St Joseph's Primary School

​

SECTOR

Educational

​

ARCHITECT 

Three C Architects

 

BUILDER 

Long Contracting

ENGINEER 

TGA Engineers

 

LOCATION

Glenferrie Rd, Hawthorn

​

COMPLETION

2016

​

PHOTOGRAPHER

True Blue Design

CLIENT

St Joseph's Primary School

 

SECTOR

Educational

​

ARCHITECT 

Three C Architects

 

BUILDER 

Long Contracting

​

ENGINEER 

TGA Engineers

 

LOCATION

Glenferrie Rd, Hawthorn

​

COMPLETION

2016

​

PHOTOGRAPHER

True Blue Design

Projects

Factory of the Future

SJPS-10.jpg
SJPS-6.jpg
bottom of page