top of page
IMG_3058.jpg
Dome_17.jpg
IMG_3058.jpg
SJTA12.jpg

Factory of the Future

St John The Apostle Catholic Primary School

CLIENT

St Andrew's Parish

ARCHITECT 

Baldasso Cortese Architects

 

BUILDER 

Magellan Projects, David Pettitt, Marcus Lawrence

ENGINEER 

TGA Engineers, Duncan Bourke 

LOCATION

Tarneit, Victoria

COMPLETION

2014

The St John The Apostle Catholic Primary School project included the full design, detailing and shop fabrication of Architectural LVL timber columns and rafters supporting 2000m2 of roof.

The structural design for this project was completed TGA Engineers, which eventually led to the contract for the fabrication. All aspects of the structure from foundations to steel and timber framing was designed by our engineering team. 

With our integrated drafting software and precision CNC cutting we were able to provide cost-effective and striking timber system that connected seamlessly with not only our timber, but the project steelwork as well. The shop fabrication of the timber facilitated the parallel construction between the site works and the timber frame to help the builder stay on schedule.
 

Dome_17.jpg
SJTA15.jpg
SJTA11.jpg
SJTA16.jpg
SJTA13.jpg
Dome_16.JPG
SJTA14.jpg
Dome_18.jpg
Dome_02.jpg
bottom of page