Factory of the Future
St John The Apostle Catholic Primary School
ENGINEER
TGA Engineers, Duncan Bourke
LOCATION
Tarneit, Victoria
COMPLETION
2014
The St John The Apostle Catholic Primary School project included the full design, detailing and shop fabrication of Architectural LVL timber columns and rafters supporting 2000m2 of roof.
The structural design for this project was completed TGA Engineers, which eventually led to the contract for the fabrication. All aspects of the structure from foundations to steel and timber framing was designed by our engineering team.
With our integrated drafting software and precision CNC cutting we were able to provide cost-effective and striking timber system that connected seamlessly with not only our timber, but the project steelwork as well. The shop fabrication of the timber facilitated the parallel construction between the site works and the timber frame to help the builder stay on schedule.